MIP FAQs: MIP Reports

  1. In the Study Flood Engineering report, where is the value for column ‘DCS Compliant’ coming from? (DCS – Data Capture Standards)
1. In the Study Flood Engineering report, where is the value for column ‘DCS Compliant’ coming from? (DCS – Data Capture Standards)

It is from the question in Validate Content Submission activity screen – "Adhere to guidelines and specifications at time of contract". If user checks this box, the value of ‘Y’ will appear on the report.

Back to to